DIESEL THROTTLE BODY INSTALLATION

PROCEDURE

  1. INSTALL DIESEL THROTTLE BODY ASSEMBLY

    1. Install a new gasket and the diesel throttle body assembly with the 2 nuts and 2 bolts.

      11 N*m

      112 kgf*cm

      8 ft.*lbf

    2. Connect the connector to the diesel throttle body assembly.

    3. Connect the No. 6 water by-pass hose to the diesel throttle body assembly, and slide the clip to secure it.

    4. Connect the No. 7 water by-pass hose to the diesel throttle body assembly, and slide the clip to secure it.

  2. INSTALL NO. 3 AIR HOSE

    1. A214411C01

      *a

      Embossed Mark

      *b

      Rear

      *c

      RH

      *d

      Paint Mark

      Align the embossed mark of the throttle body with the paint mark of the No. 3 air hose.

    2. Align the embossed mark of the No. 2 air tube within the paint mark of the No. 3 air hose.

    3. A204361N01

      Tighten the hose clamp of the No. 3 air hose on the diesel throttle body assembly side.

      Tip:
      • Align the paint mark of the air hose with the protrusion and push in the air hose so that distance B is 0 to 2 mm (0 to 0.0787 in.).

      • Position the clamp so that distance A is 4 to 9 mm (0.157 to 0.354 in.).

    4. A204362N01

      Tighten the hose clamp of the No. 3 air hose on the No. 2 air tube side.

      Tip:
      • Align the paint mark of the air hose with the protrusion and push in the air hose so that distance B is 0 to 2 mm (0 to 0.0787 in.).

      • Position the clamp so that distance A is 9 to 15 mm (0.354 to 0.591 in.).

  3. ADD ENGINE COOLANT

  4. INSPECT FOR COOLANT LEAK

  5. INSTALL NO. 1 ENGINE UNDER COVER

  6. INSTALL FRONT LOWER BUMPER ABSORBER

  7. INSTALL NO. 1 ENGINE COVER

  8. PERFORM INITIALIZATION