ROOF DRIP SIDE FINISH MOULDING INSTALLATION
CAUTION / NOTICE / HINT
Use the same procedure for the RH and LH sides.
The procedure described below is for the LH side.
PROCEDURE
INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP (for Standard Roof)
Note:When installing new No. 1 roof drip side finish moulding clips, remove the double-sided tape remaining where the No. 1 roof drip side finish moulding clips will be installed on the body and clean the body with non-residue solvent.
-
*a
Adhesive
*b
2 to 3 mm bead of adhesive
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to 2 new No. 1 roof drip side finish moulding clips.
Tip:Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
-
*a
Protruding part
Install the No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).
Table 1. Standard Dimension Dimension
Measurement
A
3.9 mm (0.154 in.)
B
4.0 mm (0.157 in.)
C
2.4 mm (0.0945 in.)
D
1.5 mm (0.0591 in.)
E
3.4 mm (0.134 in.)
F
3.6 mm (0.142 in.)
G
2.6 mm (0.102 in.)
H
1.2 mm (0.0472 in.)
Install the center roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 No. 1 roof drip side finish moulding clips.
Tip:Initial hardening time: 20 minutes
Complete hardening time: 48 hours
-
INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP (for Glass Roof)
Note:When installing new No. 1 roof drip side finish moulding clips, remove the double-sided tape remaining where the No. 1 roof drip side finish moulding clips will be installed on the body and clean the body with non-residue solvent.
-
*1
Adhesive
*a
2 to 3 mm bead of adhesive
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to 2 new No. 1 roof drip side finish moulding clips.
Tip:Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
-
*a
Protruding part
Install the No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).
Table 2. Standard Dimension Dimension
Measurement
A
4.0 mm (0.157 in.)
B
4.0 mm (0.157 in.)
C
2.4 mm (0.0945 in.)
D
1.5 mm (0.0591 in.)
E
3.4 mm (0.134 in.)
F
3.6 mm (0.142 in.)
G
2.6 mm (0.102 in.)
H
1.2 mm (0.0472 in.)
Install the center roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 No. 1 roof drip side finish moulding clips.
Tip:Initial hardening time: 20 minutes
Complete hardening time: 48 hours
-
INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING (for Standard Roof)
-
Engage the 2 No. 1 roof drip side finish moulding clips and install the center roof drip side finish moulding.
-
INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING (for Glass Roof)
-
Engage the 2 No. 1 roof drip side finish moulding clips and install the center roof drip side finish moulding.
-