ENGINE UNIT INSTALLATION

PROCEDURE

  1. INSTALL NO. 1 VACUUM PUMP BRACKET

    1. Install a new gasket and the No. 1 vacuum pump bracket with the 2 bolts.

      21 N*m

      214 kgf*cm

      15 ft.*lbf

  2. INSTALL VACUUM PUMP ASSEMBLY

  3. INSTALL IGNITION COIL ASSEMBLY

  4. INSTALL THERMOSTAT

  5. INSTALL WATER INLET

  6. INSTALL WATER INLET HOSE

    1. Install the water inlet hose with the 2 clamps.

  7. INSTALL WATER BY-PASS HOSE

    1. Install the water by-pass hose with the clamp.

  8. INSTALL NO. 1 WATER BY-PASS PIPE

    1. Install the No. 1 water by-pass pipe with the 2 bolts.

      21 N*m

      214 kgf*cm

      15 ft.*lbf

  9. CONNECT NO. 3 WATER BY-PASS HOSE

  10. INSTALL VENTILATION HOSE

    1. Install the ventilation hose to the ventilation valve.

  11. INSTALL EXHAUST MANIFOLD

  12. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

  13. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

    1. Apply a light coat of engine oil to a new O-ring.

    2. Install the O-ring to the engine oil level dipstick guide.

    3. Install the engine oil level dipstick guide with the bolt.

      21 N*m

      214 kgf*cm

      15 ft.*lbf

    4. Install the engine oil level dipstick.

  14. INSTALL FUEL INJECTOR ASSEMBLY

  15. INSTALL NO. 1 DELIVERY PIPE SPACER

  16. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

  17. INSTALL FUEL TUBE SUB-ASSEMBLY

  18. INSTALL WIRE HARNESS CLAMP BRACKET

  19. INSTALL DUTY VACUUM SWITCHING VALVE

  20. INSTALL INTAKE MANIFOLD

  21. INSTALL THROTTLE BODY ASSEMBLY