THERMOSTAT INSTALLATION

PROCEDURE

  1. INSTALL THERMOSTAT

    1. Install a new gasket to the thermostat.

    2. A294917C02

      *a

      Jiggle Valve

      Install the thermostat with the jiggle valve facing upward.

      Tip:

      The jiggle valve may be set within 10° on either side of the prescribed position.

  2. INSTALL WATER INLET

    1. Install the water inlet with the 3 bolts.

      11 N*m

      112 kgf*cm

      8 ft.*lbf

  3. INSTALL NO. 4 WATER BY-PASS PIPE

    1. Apply soapy water to a new O-ring and install it to the No. 4 water by-pass pipe.

    2. Install the No. 4 water by-pass pipe with the bolt.

      11 N*m

      112 kgf*cm

      8 ft.*lbf

    3. Connect the water by-pass hose and slide the clip to secure it.

  4. CONNECT NO. 2 RADIATOR HOSE

    1. Connect the No. 2 radiator hose and slide the clip to secure it.

  5. ADD ENGINE COOLANT

  6. INSPECT FOR COOLANT LEAK