ROOF DRIP SIDE FINISH MOULDING(for Wagon) INSTALLATION

CAUTION / NOTICE / HINT

Tip:
  • Use the same procedure for the RH and LH sides.

  • The procedure described below is for the LH side.

PROCEDURE

  1. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP

    Note:

    When installing new No. 1 roof drip side finish moulding clips, remove the double-sided tape remaining where the No. 1 roof drip side finish moulding clips will be installed on the vehicle body and clean the vehicle body with non-residue solvent.

    1. B329294C05

      *a

      Adhesive

      *b

      2 to 3 mm Bead of Adhesive

      Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to 2 new No. 1 roof drip side finish moulding clips.

      Tip:

      Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)

    2. B350233C01

      *a

      Protruding Part

      Install the No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after applying adhesive (3M DP-105 or equivalent).

      Table 1. Standard Dimension

      Dimension

      Measurement

      A

      3.9 mm (0.154 in.)

      B

      4.0 mm (0.158 in.)

      C

      2.4 mm (0.0945 in.)

      D

      1.5 mm (0.0591 in.)

      E

      4.3 mm (0.169 in.)

      F

      8.1 mm (0.319 in.)

      G

      12.8 mm (0.504 in.)

    3. Install the center roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 No. 1 roof drip side finish moulding clips.

      Tip:
      • Initial hardening time: 20 minutes

      • Complete hardening time: 48 hours

  2. INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING

    1. B350232

      Engage the 2 No. 1 roof drip side finish moulding clips and install the center roof drip side finish moulding.